Southeast Asia to Deliver Only a Third of Planned Gas Power Capacity by 2030, Wood Mackenzie Says

3 min read
Southeast Asia to Deliver Only a Third of Planned Gas Power Capacity by 2030, Wood Mackenzie Says
PrimeXBT Editorial Team
Reviewed by PrimeXBT

Topics in article

Southeast Asia's six biggest power markets will bring online just 14.9 gigawatts of a planned 53 gigawatts in new gas-fired power capacity by 2030, according to Wood Mackenzie. A shortage of gas turbines, volatile LNG costs, and financing constraints are pushing governments toward more coal near-term and faster renewables growth long-term.

Indonesia, Malaysia, Vietnam, Singapore, Thailand, and the Philippines together set a goal of adding 53 gigawatts of new gas-fired power by 2030. Wood Mackenzie now expects only 14.9 gigawatts to reach operation in time — roughly a third of the target. Fuel availability, volatile prices, and supply-chain bottlenecks threaten to drive up costs and delay projects by years, the energy consultancy said in a new report.

The delays are forcing policymakers to reconsider natural gas's role in the region's energy mix, said Wei Han Tan, Southeast Asia power and renewables research analyst at Wood Mackenzie. That suggests coal could play a bigger part near-term, with renewables gaining more ground in both the near and long term, than previously expected.

Turbine shortage tops the list of bottlenecks

Only 11 gigawatts of the region's gas-to-power pipeline has secured turbines so far, Wood Mackenzie said, amid a global shortage of the component. Capacity that hasn't locked in turbines is likely to face delivery lead times of at least five years, Wood Mackenzie said.

"The challenge today is not planning power projects but executing them," said Alvin Tan, a Wood Mackenzie analyst. New capacity depends on LNG infrastructure, financing, and turbine availability, and a bottleneck in any one can delay an entire project, he added.

Vietnam and Indonesia face the biggest gaps

Singapore appears on track to meet its 2030 goal, having secured turbine supply for all its major projects due before then. Vietnam faces the steepest shortfall: only 3.7 gigawatts of a 29.4-gigawatt target are likely to start operating by 2030. Indonesia, the region's largest economy, has locked in turbines for just 200 megawatts of a planned 8.4-gigawatt pipeline, leaning instead on solar and domestic coal.

Middle East crisis reshapes near-term supply

The war in the Middle East has tightened LNG markets and driven up gas prices, pushing some governments toward increased coal use as a stopgap. Coal cannot fully replace the lost gas supply, but it is providing a buffer through the biggest supply disruption energy markets have faced.

That's not a coal comeback but a reality check for the region's energy transition, said Tonmit Talukdar, a coal analyst at Rystad Energy. The crisis has made diversification a priority, with clean energy, electrification, and efficiency as levers to reduce import exposure and strengthen the region's energy systems, the International Energy Agency said.

Renewables set to triple by 2035

The IEA expects Southeast Asia's renewable capacity, at 120 gigawatts in 2024, to nearly triple by 2035 under current policies. That figure could jump fivefold if every announced target is met.

Still, the IEA expects coal and gas-fired plants to keep supplying the bulk of the region's electricity through 2050 under most scenarios, even as they shift toward more flexible operation.

Source: Oilprice.com

Trading involves risk.

Most traded markets

XAU / USD
-0.9% 4,127.61
BRENT
+1.35% 73.620
BTC / USD
+0.7% 63,151.2
EUR / USD
-0.12% 1.14269
USTEC
-0.91% 29,428.7
XAU / USD.24
-0.9% 4,127.61
View all markets

Author

PrimeXBT
Our Editorial Team consists of leading experts with a proven record in the fields of trading, cryptocurrencies, blockchain and finance. We thoroughly research the sources of information in order to provide readers with quality content that serves edu...
Read author’s articles
Alert Triangle Risk Disclaimer
Disclaimer: Some past publications may be outdated. We recommend following our news to stay up to date with the latest information. For any questions, feel free to contact our support team via the chat below.
The content provided here is for informational purposes only. It is not intended as personal investment advice and does not constitute a solicitation or invitation to engage in any financial transactions, investments, or related activities. Past performance is not a reliable indicator of future results.
The financial products offered by the Company are complex and come with a high risk of losing money rapidly due to leverage. These products may not be suitable for all investors. Before engaging, you should consider whether you understand how these leveraged products work and whether you can afford the high risk of losing your money.
The Company does not accept clients from the Restricted Jurisdictions as indicated in our website/ T&C. Some services or products may not be available in your jurisdiction.
The applicable legal entity and its respective products and services depend on the client’s country of residence and the entity with which the client has established a contractual relationship during registration.

Today in markets

Browse Commodities News

Register Now

Trading involves risk

Get started in minutes

Our clients love how fast and simple our sign-up is. It takes just a few minutes to get started!

Get Started Get Started
Get started in minutes

Need Help?

Risk Warning:
Trading in leveraged products carries a high level of risk and may not be suitable for all investors.